The Oklahoma Mesonet Technicians (Phillip Browder, Robert Heck, Kris Kesler,
Ken Meyers, and Bill Wyatt) completed Fall Pass 2007 in December. During
a three-month period, all of the 119 Mesonet stations were visited. General
site maintenance and inspections were performed. Also, over 1,500 site
photos were taken to document the appearance of the stations before and after
each technician’s visit.
This page was created to organize the multitude of information gathered during
Fall Pass 2007. To the left of the page, you will find links to a list
of accomplishments from this pass, photos of the stations, interesting site-specific
findings, and site visitation forms on which notes were recorded.
|